Federal Electricity Commission
Valladolid Thermoelectric Project with 1,000 tons of machinery with various overweights and oversizes.
Valladolid Thermoelectric Project with 1,000 tons of machinery with various overweights and oversizes.
Electrical Transformers. 60 transformers weighing 30 to 120 tons per unit were imported.
3 assembly lines with 3,000 tons of machinery (Production lines for the automotive industry).
Cranes and electrical transformers, some with unit weights of 300 tons.
Complete production plant with 2,000 tons of machinery with different oversizes and overweights. In total 2 production lines for the food and beverage industry.
1,000 tons of chemical process cooling towers, some of them 15 meters long and weighing 120 tons. These were projects for the PEMEX petrochemical industry.
5 hydraulic presses of 300 tons each for its production lines in the automotive industry.
Combined Cycle Thermoelectric Project with 800 tons of various overweights and oversizes carried out by Iberdrola Engineering and Construction Mexico.
Substations 3, 4 and 5 of Altamira, Tamaulipas, Laguna Verde, Ver and Jiménez, Chihuahua of the Federal Electricity Commission.
Encapsulated substation, Monterrey, Nuevo León. For the Federal Electricity Commission.
Metal structures for electrical substations, Guanacaste, Costa Rica.
1,350 tons of Pipe for the Lakach Deepwater project, for the field of the same name.
Supply management for the Clean Gasolines project in Salamanca, Hidalgo, Mexico
2 filtros separadores, con un peso de 42.53 Ton cada una, para el proyecto, Gasoducto El Encino - Topolobampo, Chihuahua.
Oily Drainage Tank, weighing 10 tons for the El Encino - Topolobampo Gas Pipeline project, Chihuahua.
675,857 tons of Valves, Steel Pipe and pipe fittings from Italy, for the El Encino - Topolobampo Gas Pipeline project, Chihuahua.
8 Aero coolers with dimensions of 12m long, 5.76m wide and 5m high with a gross weight of 43.18 tons each, for the El Encino - Topolobampo Gas Pipeline project, Chihuahua.
6 Aero coolers with dimensions of 9m long, 4.11m wide and 5m high with a gross weight of 17 tons each, for the project, La Laguna Compression Station, Dgo.
9 Aero coolers with dimensions of 9m long, 4.11m wide and 5m high with a gross weight of 17 tons each, for the Villa de Reyes Compression Station project, SLP
Coordination of loading and unloading maneuvers with equipment of up to 500 tons nominal capacity for the project.
Coordination of loading and unloading maneuvers with equipment of up to 500 tons nominal capacity for the project.
Coordination of loading and unloading maneuvers with equipment of up to 100 tons of nominal capacity for the project.
Coordination of loading and unloading maneuvers with forklift equipment of up to 15,000 lb capacity for the project.
Coordination of loading and unloading maneuvers with forklift equipment of up to 15,000 Lb nominal capacity for the project.
Coordination in the Door-to-Door transfer of 2 Steel tanks for hydrocarbon storage, manufactured in the State of Veracruz, weighing 1,560 tons each, Puerto Rosales Argentina. 2023-2024.